FAS Research Computing - Slurm Scheduler high load – Incident details
All systems operational
Status page for the Harvard FAS Research Computing cluster and other resources.
WINTER BREAK: Harvard and FASRC will be closed for winter break as of Sat. Dec 21st, 2024. We will
return on Jan. 2nd, 2025. We will monitor for critical issues. All other work will be deferred until we return.
Cluster Utilization (VPN and FASRC login required): Cannon | FASSE
Please scroll down to see details on any Incidents or maintenance notices.
Monthly maintenance occurs on the first Monday of the month (except holidays).
The colors shown in the bars below were chosen to increase visibility for color-blind visitors. For higher contrast, switch to light mode at the bottom of this page if the background is dark and colors are muted.
Slurm Scheduler high load
Resolved
Degraded performance
Started 17 days agoLasted about 2 hours
Affected
Cannon Cluster
SLURM Scheduler - Cannon
Updates
Resolved
Resolved
The scheduler load has returned to normal. A root cause was identified and remediated.
Identified
Identified
The scheduler is experiencing a high load at the moment which may manifest as slowness, timeout or general instability for job scheduling.
We are actively working to mitigate this.