FAS Research Computing - Cannon cluster degraded – Incident details

Status page for the Harvard FAS Research Computing cluster and other resources.
WINTER BREAK: Harvard and FASRC will be closed for winter break as of Sat. Dec 21st, 2024. We will return on Jan. 2nd, 2025. We will monitor for critical issues. All other work will be deferred until we return.

Cluster Utilization (VPN and FASRC login required): Cannon | FASSE


Please scroll down to see details on any Incidents or maintenance notices.
Monthly maintenance occurs on the first Monday of the month (except holidays).

GETTING HELP
https://docs.rc.fas.harvard.edu | https://portal.rc.fas.harvard.edu | Email: rchelp@rc.fas.harvard.edu


The colors shown in the bars below were chosen to increase visibility for color-blind visitors.
For higher contrast, switch to light mode at the bottom of this page if the background is dark and colors are muted.

Cannon cluster degraded

Resolved
Degraded performance
Started 4 months agoLasted about 5 hours

Affected

Cannon Cluster
SLURM Scheduler - Cannon
Cannon Compute Cluster (Holyoke)
Boston Compute Nodes
GPU nodes (Holyoke)
seas_compute
Updates
  • Resolved
    Resolved
    The power issue has been resolved. All nodes that were drained are now being re-opened.
  • Investigating
    Investigating

    Due to temporary power availability issues in MGHPCC, half the nodes in 8A have been set to drain. This affects all partitions. Jobs will take longer to schedule but will not be terminated.

    We will reopen these nodes once the power issue has been resolved at the datacenter. No ETA at this time